Pfizer - Plant logistics

Pfizer in collaboration with CRC Engineering
 

     

    Fast implementation due to high level of detail

    The project “Plant logistics” consists of a high - and low-rise. An automatic stacking is provided in the high-rise section. In the low-rise section the sample booths and inspection lines are included. In the low building, on the second floor, an extra level was provided during construction.

    There were time constraints on the planning, specifications, PID’s, automation strategies and the 3D models, which made the architecture&installation,  technically coordinated with a high degree of detail. Therefore the contractors were able to start the implementation as quickly as possible.

     

    Services provided

    • Detailed design
    • Project management
    • 2D & 3D coordination

     


    Applied Techniques

    General Techniques
    • Heating system
    • Ventilation
    • Cooling system
    • Automatisation
    • Plumbing
    • Walls
    • Floors
    • Ceiling
     
    Special Techniques
    • Compressed air
    • Vacuum
    • Steam
    • City water
    • DI water
    • Sprinkler
    • RWA en agitation

     