Pfizer - Plant logistics
Pfizer in collaboration with CRC Engineering
Fast implementation due to high level of detail
The project “Plant logistics” consists of a high - and low-rise. An automatic stacking is provided in the high-rise section. In the low-rise section the sample booths and inspection lines are included. In the low building, on the second floor, an extra level was provided during construction.
There were time constraints on the planning, specifications, PID’s, automation strategies and the 3D models, which made the architecture&installation, technically coordinated with a high degree of detail. Therefore the contractors were able to start the implementation as quickly as possible.
Services provided
- Detailed design
- Project management
- 2D & 3D coordination
Applied Techniques
General Techniques
- Heating system
- Ventilation
- Cooling system
- Automatisation
- Plumbing
- Walls
- Floors
- Ceiling
Special Techniques
- Compressed air
- Vacuum
- Steam
- City water
- DI water
- Sprinkler
- RWA en agitation